| New Bus Depot, Sharston Industrial Estate |
| |
| Location: Manchester |
| Value: £4,812,670 |
| Client: Stagecoach Group |
| Duration: 52 weeks |
New Build Bus Depot and Ancilliary Buildings; steel frame structure, insitu concrete ground floor slab with prefabricated steel floor pits, metal deck/insitu concrete first floor, external walls in composite caldding with electrically operated roller shutter doors and aluminium windows, internal walls in blockwork/metal stud partitions, plaster/painted walls, suspended ceilings, carpet/vinyl floor coverings, mechanical/electrical/lift installations, new concrete external hardstanding and drainage installations.
|
|
|