 |
| |
* Part of the Yorbuild Framework * Logistically complex tight site
Photos include:- - Start on Site Ceremony - Steel frame being erected |
|
|
| Ridgewood School: Post 16 Centre |
| |
| Location: Doncaster |
| Value: £4.96m |
| Client: Doncaster Metropolitan Borough Council |
| Duration: |
Allenbuild have secured their first project via the YORbuild construction framework, a new £5.0m sixth form centre at Ridgewood School, Scawsby for Doncaster Council.
The new 2-storey building will provide 300 new places enabling sixth-formers to stay on at Ridgewood School for the first time. The post-16 centre has a contemporary design, shaped like an arrow it also takes potential future redevelopment into account.
The sustainable new building will incorporate a raft of green features, including a rain water collection system on the roof which will provide water for the toilets, and solar electricity generators.
Construction work commences in June and will run until summer next year, with the first intake of pupils scheduled for September 2011.
|
|
|
|