Case studies: Education
Client: Westminster City Council
Architect: Shepheard Epstein Hunter
Quantity Surveyor Summers Inman
Value: £2.2m
The project comprised of refurbishment works within the existing school and a 3-storey copper clad glulam timber frame extension, with an internal atrium access and an external staircase.
The façade was clad in pre-patinated copper with a coloured glazing screen system.
The construction incorporated a new kitchen, IT suite, staff accommodation, lift and class rooms.
The existing school and the new extension are linked with a fully glazed atrium made up of composite windows within a steel frame construction.